Master Bathroom
Send comments to Roy
Item Date Added Added By Date Completed Completed By Comments
1 a Paint Faucet 12/25/2004 SC 3/20/2005 SC 1 1
2 a Paint electrical face plates 12/25/2004 SC 12/28/2004 SC 1 1
3 a Install electrical face plates 12/25/2004 SC 12/28/2004 SC 1 1
4 a Check shower door runners 12/25/2004 SC 1/16/2005 RB 1 1
5 a Remove hardware from door 12/28/2004 RB 12/30/2004 RB 1 1
6 a Primer on door 12/25/2004 SC 1/3/2005 RB 1 1
7 a Paint door 12/25/2004 SC 1/4/2005 RB 1 1
8 a Install hardware on door 12/28/2004 RB 1/5/2005 RB 1 1
9 a Install door 12/25/2004 SC 1/9/2005 RB 1 1
10 a Install floor separator 12/25/2004 SC 12/26/2004 JR 1 1
11 a Paint vent 12/25/2004 SC 12/25/2004 SC 1 1
12 a Tape doorway for painting 1/6/2005 RB 1/6/2005 RB 1 1
13 a Primer on door trim 1/6/2005 RB 1/6/2005 RB 1 1
14 a Paint door trim 1/6/2005 RB 1/9/2005 RB 1 1
15 a Clean and paint door hardware 1/6/2005 RB 1/6/2005 RB 1 1
16 a Primer on door hardware 12/28/2004 RB 1/2/2005 RB 1 1
17 a Paint door hardware 12/28/2004 RB 1/3/2005 RB 1 1
18 a Replace screen 3/29/2005 RB 4/10/2005 RB 1 1
19 a Repair window 3/29/2005 RB 4/8/2005 RB 1 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
19 19