Master Bedroom
Send comments to Roy
Item Date Added Added By Date Completed Completed By Comments
1 a Paint vents 12/25/2004 SC 12/25/2004 SC 1 1
2 a Paint electrical face plates 12/25/2004 SC 12/28/2004 SC 1 1
3 a Install electrical face plates 12/25/2004 SC 12/28/2004 SC 1 1
4 a Primer on base boards in closet 12/28/2004 RB 12/30/2004 RB 1 1
5 a Paint base boards in closet 12/28/2004 RB 1/3/2005 RB 1 1
6 a Install base boards in closet 12/25/2004 SC 1/24/2005 RB 1 1
7 a Remove hardware from door 12/28/2004 RB 12/30/2004 RB 1 1
8 a Primer on door 12/25/2004 SC 1/3/2005 RB 1 1
9 a Paint door 12/25/2004 SC 1/4/2005 RB 1 1
10 a Install hardware on door 12/28/2004 RB 1/8/2005 RB 1 1
11 a Install door 12/25/2004 SC 1/10/2005 RB 1 1
12 a Install fire alarm 12/25/2004 SC 1/3/2005 RB 1 1
13 a Switch plug in to right side up 1/1/2005 RB 1/1/2005 RB 1 1
14 a Clean and paint door hardware 1/6/2005 RB 1/6/2005 RB 1 1
15 a Tape doorway for painting 1/6/2005 RB 1/6/2005 RB 1 1
16 a Primer on door trim 1/6/2005 RB 1/7/2005 RB 1 1
17 a Paint door trim 1/6/2005 RB 1/8/2005 RB 1 1
18 a Clean ceiling fan 1/8/2005 RB 1/8/2005 JB 1 1
19 a Switch switches 1/8/2005 RB 1/10/2005 RAB 1 1
20 a Primer door hardware 12/28/2004 RB 1/2/2005 RB 1 1
21 a Paint door hardware 12/28/2004 RB 1/3/2005 RB 1 1
22 a Replace screens 3/29/2005 RB 4/10/2005 RB 1 1
23 a Fix closet rails 3/3/2005 SC 3/19/2005 RAB 1 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
23 23